Hometime - Season 23

Hometime

Season 23

2009 • 26 Episodes

Episodes

Digging Out the Yard - Hometime

1. Digging Out the Yard

February 7, 2009

The Hometime crew re-grades a sloping back yard, installs a drainage system, and begins building a series of paver patios.

Urban Terraces - Hometime

2. Urban Terraces

February 14, 2009

The Hometime crew weaves several retaining walls, steps, and patios into a small, sloped back yard.

Caretaker's Home - Hometime

3. Caretaker's Home

February 21, 2009

The Hometime crew restores the porch of what was once the caretaker’s home on a 40-acre, turn-of-the-century lakeside estate.

Entrance Plaza - Hometime

4. Entrance Plaza

March 7, 2009

The Hometime crew renovates a church courtyard with a textured concrete walkway, custom wood benches, and a raised planting bed.

Betsy-Tacy Home: Decoration - Hometime

5. Betsy-Tacy Home: Decoration

April 4, 2009

The Hometime crew makes its last visit to this historic home to create a sidewalk outside and to finish painting and wallpapering the interior.

Eat-In-Kitchen: Demolition - Hometime

6. Eat-In-Kitchen: Demolition

April 11, 2009

The Hometime crew takes a small kitchen and starts work to improve storage and functionality.

Eat-In-Kitchen: Cabinets - Hometime

7. Eat-In-Kitchen: Cabinets

April 18, 2009

The Hometime crew installs new kitchen cabinets, a new sliding door and new floor tile.

Eat-In-Kitchen: Wrap Up - Hometime

8. Eat-In-Kitchen: Wrap Up

April 25, 2009

The Hometime crew installs countertops and appliances, as well as a new wood floor for the adjacent living room.

Sculpture Studio: Framing - Hometime

9. Sculpture Studio: Framing

May 2, 2009

The Hometime crew converts an unused, tuck-under garage into a metal-working studio with a new heater and a downsized garage door.

Sculpture Studio: Finishing - Hometime

10. Sculpture Studio: Finishing

May 9, 2009

The Hometime crew wraps up the workshop with doors, windows and welding equipment.

Great Room Hardwood Floor - Hometime

11. Great Room Hardwood Floor

September 5, 2009

The Hometime crew installs a super-hard, prefinished wood floor.

Travertine Floor - Hometime

12. Travertine Floor

September 12, 2009

The Hometime crew installs large-format limestone flooring.

Seven-Year Plan - Hometime

13. Seven-Year Plan

September 19, 2009

The Hometime crew works with a designer to identify and prioritize a house-wide makeover. Then they begin with the first phase: tearing apart the living room and dining room.

Kitchen Facelift - Hometime

14. Kitchen Facelift

September 26, 2009

The Hometime crew transforms a kitchen with re-faced cabinets along with new counters, tile, appliances and lighting.

Great Room Update - Hometime

15. Great Room Update

October 3, 2009

The Hometime crew uses new trim, wood flooring, lighting, paint and furniture to transform a dated, 1970s living room and dining room.

Linoleum Flooring - Hometime

16. Linoleum Flooring

October 10, 2009

The Hometime crew installs sheet and tile linoleum on the Hometime log cabin basement floor.

Cabin Kitchen Upgrade - Hometime

17. Cabin Kitchen Upgrade

October 17, 2009

The Hometime crew modifies and upgrades cabinets, appliances, countertops and plumbing fixtures.

Vacation Home Laundry Room - Hometime

18. Vacation Home Laundry Room

October 24, 2009

The Hometime crew adds new cabinets and plumbing fixtures to a log cabin lower level.

Historic Summer Home -- Structural Upgrades - Hometime

19. Historic Summer Home -- Structural Upgrades

October 31, 2009

Dean, Miriam and the Hometime crew remove cabinets, asbestos flooring and a concrete slab then ingeniously reinforce sagging walls and pour a new concrete kitchen floor.

Historic Summer Home -- Kitchen - Hometime

20. Historic Summer Home -- Kitchen

November 7, 2009

Dean, Miriam and the Hometime crew rebuild old cabinets and install historically sensitive countertops, flooring, fixtures and appliances remodeling this 100-year-old kitchen.

Barrel Vault Basement - Hometime

21. Barrel Vault Basement

November 14, 2009

The Hometime crew transforms a bland, unfinished basement by juggling doors and windows, repairing humps and cracks in the floor, and creating an arched ceiling.

Party Kitchen - Hometime

22. Party Kitchen

November 21, 2009

The Hometime crew puts in doors, tile and cabinets for the basement wet bar and peninsula.

Arched Wood Panels - Hometime

23. Arched Wood Panels

November 28, 2009

The Hometime crew puts in granite countertops and a trendy shower door then wrap up the custom wood paneling around a basement fireplace.

Attic Trusses - Hometime

24. Attic Trusses

December 5, 2009

The Hometime crew shores up the block walls then uses attic trusses to create a room over a flat-roofed, detached garage.

Standalone Garage - Hometime

25. Standalone Garage

December 12, 2009

The Hometime crew seals up the exterior of the garage and the new studio above it.

Yoga Studio - Hometime

26. Yoga Studio

December 19, 2009

The upstairs studio gets paint, flooring, and lighting. The downstairs garage gets flooring and cabinets.