2009 • 26 Episodes
February 7, 2009
The Hometime crew re-grades a sloping back yard, installs a drainage system, and begins building a series of paver patios.
February 14, 2009
The Hometime crew weaves several retaining walls, steps, and patios into a small, sloped back yard.
February 21, 2009
The Hometime crew restores the porch of what was once the caretaker’s home on a 40-acre, turn-of-the-century lakeside estate.
March 7, 2009
The Hometime crew renovates a church courtyard with a textured concrete walkway, custom wood benches, and a raised planting bed.
April 4, 2009
The Hometime crew makes its last visit to this historic home to create a sidewalk outside and to finish painting and wallpapering the interior.
April 11, 2009
The Hometime crew takes a small kitchen and starts work to improve storage and functionality.
April 18, 2009
The Hometime crew installs new kitchen cabinets, a new sliding door and new floor tile.
April 25, 2009
The Hometime crew installs countertops and appliances, as well as a new wood floor for the adjacent living room.
May 2, 2009
The Hometime crew converts an unused, tuck-under garage into a metal-working studio with a new heater and a downsized garage door.
May 9, 2009
The Hometime crew wraps up the workshop with doors, windows and welding equipment.
September 5, 2009
The Hometime crew installs a super-hard, prefinished wood floor.
September 12, 2009
The Hometime crew installs large-format limestone flooring.
September 19, 2009
The Hometime crew works with a designer to identify and prioritize a house-wide makeover. Then they begin with the first phase: tearing apart the living room and dining room.
September 26, 2009
The Hometime crew transforms a kitchen with re-faced cabinets along with new counters, tile, appliances and lighting.
October 3, 2009
The Hometime crew uses new trim, wood flooring, lighting, paint and furniture to transform a dated, 1970s living room and dining room.
October 10, 2009
The Hometime crew installs sheet and tile linoleum on the Hometime log cabin basement floor.
October 17, 2009
The Hometime crew modifies and upgrades cabinets, appliances, countertops and plumbing fixtures.
October 24, 2009
The Hometime crew adds new cabinets and plumbing fixtures to a log cabin lower level.
October 31, 2009
Dean, Miriam and the Hometime crew remove cabinets, asbestos flooring and a concrete slab then ingeniously reinforce sagging walls and pour a new concrete kitchen floor.
November 7, 2009
Dean, Miriam and the Hometime crew rebuild old cabinets and install historically sensitive countertops, flooring, fixtures and appliances remodeling this 100-year-old kitchen.
November 14, 2009
The Hometime crew transforms a bland, unfinished basement by juggling doors and windows, repairing humps and cracks in the floor, and creating an arched ceiling.
November 21, 2009
The Hometime crew puts in doors, tile and cabinets for the basement wet bar and peninsula.
November 28, 2009
The Hometime crew puts in granite countertops and a trendy shower door then wrap up the custom wood paneling around a basement fireplace.
December 5, 2009
The Hometime crew shores up the block walls then uses attic trusses to create a room over a flat-roofed, detached garage.
December 12, 2009
The Hometime crew seals up the exterior of the garage and the new studio above it.
December 19, 2009
The upstairs studio gets paint, flooring, and lighting. The downstairs garage gets flooring and cabinets.