2012 • 26 Episodes
February 4, 2012
The new home’s architecture is enhanced with continuity of garage doors, entry doors and shutters as the foundation is covered with natural thin veneer stone.
February 11, 2012
Dean, Miriam, Dan and Bucky pitch in to install a paver driveway, walkway and step veneer.
March 3, 2012
Dean, Miriam, and the Hometime crew begin updating the 1970’s remodel of a 1911 kitchen with new windows and a new patio door in the bumpout.
March 10, 2012
Double hung windows are updated with new inserts as Hometime guts the kitchen and reframes the powder room for a pocket door.
March 17, 2012
Dean and Miriam finish up rough-ins, insulation, drywall and priming to get ready for new cabinets.
March 24, 2012
Dean and Miriam show how to blend two different finishes as they install new cabinets.
March 31, 2012
Dean and Miriam get the kitchen, mud room and powder room areas ready for new flooring and countertops.
April 7, 2012
It’s time for finishing touches as Dean and Miriam trim out the kitchen, mud room and powder room.
April 14, 2012
Dean, Miriam and the Hometime crew fire up the fixtures and appliances as they wrap up the project.
April 21, 2012
Dean and Miriam look at roofing, stone, garage doors and stamped concrete from the curb appeal perspective as a new home is built.
April 28, 2012
Dean and Miriam talk about roofing, railings and a realistic gas fireplace during the construction of a screen porch.
May 5, 2012
Dean and Miriam document the construction of two new homes, built inside a home and garden show.
May 12, 2012
Dean, Miriam and the crew demo some old kitchen countertops and install new quartz surfaces.
October 6, 2012
Finishing a hilly back yard with landscape steps and tile, a fire ring, plants and sprinklers.
October 13, 2012
Planting site-appropriate trees after a storm and building a crib for firewood cut and split from the damaged timber.
October 20, 2012
Pre-building timber frame walls inside and re-building on a new slab near Hometime Log Cabin.
October 27, 2012
Pre-building timber frame style roof trusses inside and re-assembling those on site as shed construction continues.
November 3, 2012
Taking out old concrete to repair, reframe and reseal the patio over a storage area.
November 10, 2012
Re-pouring and re-stamping the concrete patio while fixing up the storage area below.
November 17, 2012
Resetting an outdoor natural stone island, covering it with granite and setting a new built-in gas grill.
November 24, 2012
Updating an island kitchen with new cabinets includes visits with the designer and the manufacturer.
December 1, 2012
Finishing up the new cabinets for the island kitchen and covering those with new countertops.
December 8, 2012
Installing lights, plumbing fixtures and appliances.
December 15, 2012
Installing custom carriage house doors and laying a system of tailored pavers.
December 22, 2012
Installing clay tile roofing and natural stone cladding for the walls.
December 29, 2012
Finishing up the exterior and getting the new shed ready for winter.